My septic has failed; what do I do?
Contact a design engineer who will design a new septic system based on the total number of bedrooms for residential properties. The design of the septic system is a multi-step process that usually involves a survey of your property, a soil and percolation test, and a sketch of your house floor plan all of which can take up to 2- 3 months depending on your engineer’s schedule, the backlog of scheduled soil tests, and the review of the final septic plan by the Health Department. The Health Department is available to guide you through this process.Health Department